
By professionalism, trust and sincerity. This time, GikaSun became the trusted company chosen by Golden Lotus Hotel. It was an honor to be accompanied by the hotel.
All stages of consultancy, product placement, construction survey until construction and completion of The solar water heater system, with solar panels in the form of vacuum glass tubes of GikaSun and water machines Australia's high-tech heat pump (Heat Pump) with other equipment, components to optimize energy, always ensure the integrity of the product quality so that the running capacity is equal to the total of 110 rooms with other departments and completion time is only within near 2 months.


